Approval granted for electricity generation licence – Flinders University - Archived

29 Jan 2021

icon

The Commission varied Flinders University electricity generation licence as follows: 

  • Authorising the operation of two additional generating plant with a maximum export limit of 200 kilowatt (kW) located at:
    o Flinders University Sturt Campus (East) – maximum capacity of 500kVA with a maximum export limit of 75kW
    o Flinders University Sturt Campus (South and West) – maximum capacity 520kVA with a maximum export limit of 125kW
  • removing a duplicated clause in Part 2, and
  • correcting the generating capacity of 1.7MW for the electricity generating plant on the original licence, to 1.52MW with a maximum export level of 1.23MW.

The Commission assessed this application against the relevant provisions within the Electricity Act 1996 and the Essential Services Commission Act 2002 and determined that all relevant criteria under those Acts have been satisfied. It has therefore approved the application.

A copy of the licence may be accessed through the project page below.

 