REPS activities
The Minister for Energy and Mining (Minister) has the function of maintaining, reviewing and amending the list of eligible Energy Productivity Activities offered through the Retailer Energy Productivity Scheme (REPS). The Minister determines the range of activities and the specifications for each activity.
Energy productivity activities and specifications (from 1 January 2021)
• General specification
• Installation of ceiling insulation – consumer safety self-assessment and installer acknowledgment form
Insulation & building sealing
Heating and cooling
Water heating
Lighting
Standby power controllers
Appliances
Time of use tariff
Virtual power plant
NABERS
Commercial and industrial demand savings
Improve energy productivity - large facilities
1A small energy consuming customer is a non-residential customer consuming less than 160MWh of electricity in the 12 months prior to any REPS activities being undertaken.