The Power Line Environment Committee (PLEC) Annual Report 2018-19 has been published and provided to the Minister for Energy and Mining in accordance with the PLEC Charter.
3 Oct 2019
Read full article
The Commission has issued an electricity generation licence to the Copper Coast Council to operate the following:
• a 150 kilowatt solar generating plant, located at Moonta, and
• a 150 kilowatt solar generating plan ...
25 Sep 2019
Read full article
The Commission has issued an electricity generation licence to South Australian Produce Markets Limited for the operation of a generating plant with a maximum output capacity of 2.9 megawatts (MW), located at Pooraka.
25 Sep 2019
Read full article
The Commission has received an application from LMS Energy Pty Ltd to vary its electricity generation licence to operate the following additional generating plant:
• a 3.2 megawatt gas reciprocating engine generating plant, located ...
25 Sep 2019
Read full article
AGL Energy Services Pty Ltd has withdrawn its electricity generation licence application for the operation of four Photovoltaic (PV) generation sites.
17 Sep 2019
Read full article
The Commission issued an electricity generation licence to AGL Barker Inlet Pty Limited for the operation of a generating plant with the maximum output capacity of 211 megawatts (MW), located at Torrens Island.
20 Aug 2019
Read full article
The Commission has received four public submissions to the consultation paper on the review of the licensing arrangements for generators in South Australia.
16 Aug 2019
Read full article
Green Gold Energy Pty Ltd has withdrawn its electricity generation licence application for the operation of a 1.65 megawatt solar generating plant, located at Bungama.
2 Jul 2019
Read full article
The Commission has published statistical information on SA Power Networks’ operational performance for the March quarter 2019, in relation to service standards set out in the Electricity Distribution Code.
26 Jun 2019
Read full article
The Commission issued an electricity generation licence to Port Pirie Solar Pty Ltd for the operation of a 4.9 megawatt solar generating plant, located at Murray Bridge.
18 Jun 2019
Read full article