SA Water’s current generation licence authorises the operation of generating plant at various sites. SA Water is seeking to vary its licence to authorise the operation of the following:

  • a ground mounted solar array and battery energy storage system generating plant with a 1.24MVA nameplate capacity, and a 657kW maximum export capacity, at the Myponga Water Filtration Plant
  • a ground mounted solar array generating plant with a 16.5MW generating capacity, and a 13.4MW maximum export capacity, located at the Mannum Adelaide No.2 Pumping Station, and
  • a ground mounted solar array generating plant with a 16.5MW generating capacity, and a 12.4MW maximum export capacity, located at the Mannum Adelaide No.3 Pumping Station.

The application is subject to a public consultation period closing on 1 March 2021. The Commission welcomes submissions on any matters relevant to the application. 

A copy of the application and information on how to make a submission, can be accessed below.

 