ESCOSA content iconVariation to clause 2.10.2(d) of the electricity transmission code

  • Project Released: 14 Apr 2011
  • Project Closes: 01 Jul 2011
  • Contact: Adam Wilson

Overview

The Commission has amended clause 2.10.2(d) of the electricity transmission code, with effect on and from 1 July 2011

Status

Current status is Final

  • Initiate
  • Final

Final

The Commission has amended clause 2.10.2(d) of the electricity transmission code, with effect on and from 1 July 2011. The amendment requires ElectraNet to effect the repair or replacement of a failed transformer should failure occur in the Adelaide Central Area as soon as possible to prevent the likelihood of an interruption as a result of the failure of any other transformer (after January 2012) or of any equivalent transformer capacity utilised by ElectraNet to meet the exit point reliability standards for that area as mandated by the electricity transmission code.